Input: User Stories

When to Use

Translating Jira tickets, PRD excerpts, design docs, or Markdown user stories into test plans.

Decision

Input type Key action
User story (As an X...) Map each part to plan section (see Pattern below)
Jira epic with multiple stories One H2 epic, one H3 per story, shared preconditions hoisted
PRD prose Identify functional claims, convert each to observable criterion, surface ambiguities in Clarifications block
Ambiguous ticket Add ## Clarifications needed block at top of draft plan

Pattern: deterministic rewrite

As an X, I want Y so that Z
Story part Plan part
As an X Preconditions: "Logged in as <X>"
I want Y Scenario title (imperative): "X does Y"
so that Z First acceptance criterion: "Z is observable as ..."

Pattern: multiple stories per input

If a single Jira epic contains five stories: - One H2 epic in the plan - One H3 scenario per story under the epic - Shared preconditions hoisted to the plan level if they apply to all stories

Pattern: extracting from Jira

Jira tickets contain noise (comments, status changes that become acceptance criteria, Slack-quote pastes). Tell the Planner explicitly:

Extract the Acceptance Criteria block and the Description only.
Do not generate criteria from the comment thread.
Do not add criteria I didn't list.

The "do not add criteria I didn't list" line prevents scope creep — a recurring failure mode where the AI invents requirements based on related tickets it can see.

Pattern: from PRD excerpts

PRDs have prose, not enumerated AC. The Planner should: 1. Identify each functional claim in the prose 2. Convert each to an acceptance criterion (observable, present-tense) 3. Surface ambiguities as ## Clarifications needed at the top of the plan

Anti-Patterns

  • Pasting the whole Jira ticket with comments — stale AC from comments override canonical AC
  • Translating "should be fast" literally — non-functional criteria need different assertions (Lighthouse, performance traces), not E2E asserts
  • One scenario per user story regardless of size — large stories split into multiple scenarios; sometimes one story = one epic

Common Mistakes

  • No Clarifications block when the story is ambiguous — Planner invents an interpretation; reviewer rubber-stamps it
  • Story title becomes plan title verbatim without imperative rewriting — "User Login Story" instead of "User logs in"
  • Acceptance criteria copied as bullets without translation — keeping "User should be able to log in" instead of "Logged-in user reaches dashboard"